VOIDDECK
Creative technology - innovative and creative VOIDDECK technology
“VOIDDECK SLAB SYSTEM” optimized for long life housing.
Winhitech’s void slab systems that combined EPS polystyrene void former and T Deck plate for the first time
World’s first
technology
commercialized
straight from the lab
Coating to prevent floating force
Reduced construction cost
Improved usability
Reduced CO₂
Guaranteed ease of installation substituting conventional forms
Easy installation
Realizes long life housing, and long span structure
Reduced inter-floor noise
Reduced construction period and construction cost
Reduced floor height and dead load
VOIDDECK SLAB SYSTEM
T Deck + EPS void slabWinhitech’s VOIDDECK slab system improves the quality of space and life.
Variability of Space
The product supports space design tailored for the living pattern of users by applying VD system in columnar structures as well as diverse space remodeling according to changing needs (customized structure design).
Key solution leading the long-life residential culture
– Winhitech’s “Void Slab System”
Bearing wall structure
Found in conventional apartments. Hinders liberal remodeling due to the presence of bearing walls
Columnar variable structure
Found in government long-term residential plan. Supports remodeling tailored for diverse tastes
Reduced inter-floor noise
With multiple patents and certifications under its belt, the VOIDDECK slab system will lay the groundwork for improved living quality thanks to its excellent inter-floor noise reduction capability.Realization of long-life housing
Reduced inter-floor noise/Supports variable structure
Certified structure with proven performance to block floor shock noise (KICT, Sep. 2013)
Winhitech’s VOIDDECK slab system improves the quality of space and life.
Reduced floor height
Bearing wall structure makes it difficult to reduce floor height due to its structure consisting of columns, girders and slabs. Now the columnar structure for long-life housing allows application of VD system, thereby facilitating the reduction of floor height.Reduced dead load
Application of VD system enables economic design since the hollow space inside the slab reduces its dead load.VOIDDECK SLAB SYSTEM
VOIDDECK SLAB SYSTEM is excellent in meeting the reduced total height requirement thanks to reduced floor height and rational arrangement of piping allows to adjust the floor height.Piping layout in general RC structure
Piping layout in a structure applied with VOIDDECK technology
Winhitech’s VOIDDECK slab system supports efficient and convenient construction works.
Pre-fabrication installation
As the VD systems are pre-fabricated in the company’s Eumseong Plant equipped with highly precision automated system, it guarantees easy workability and reduces total construction period.No need to remove forms
The use of VD system eliminates the need for removing the forms after the concrete paste has been cured, thereby reducing the effort and energy Reducing cleanup site and the time, energy consumption clean the site.Winhitech’s VOIDDECK slab system supports high quality installation.
Uniform arrangement of polystyrene void former
The VD system supports uniform arrangement of polystyrene void former by integrating the deck and polystyrene void former.Fire resistant structure
The top concrete excluding polystyrene void former is less than 100mm in thickness, eliminating the need for separate fire resistant certification.Integration of deck and polystyrene void former
Supports uniform arrangement of polystyrene void former / Helping to avoid depression of polystyrene void former.VD1 SYSTEM
VD2 SYSTEM
Winhitech’s VD slab system promotes healthy environment.
Low carbon and environment friendly
The VD system reduced CO₂ emissions by reducing the amount of rebar reinforced concrete.Sustainability (long life housing)
The VD system enables construction of sustainable space with over 100 year life span thanks to its environment friendly and variable customizable structure.Rhamen Structure
VOIDDECK SLAB SYSTEM
CO₂ Emissions Statistics
- Concrete 0.3ton per m³ - Rebar: 3.5ton per 1tonInstallation of DECK PLATE
Laying out lower rebar
Laying out of lightweight parts
Laying out of upper rebar
Pouring of concrete
Installation of DECK PLATE
Laying out of lower rebar
Laying out of lightweight parts
Installation of fixing device
Laying out of upper rebar
Pouring of concrete